View All Posts

Jul 03

Work Continues on N Sleepy Hollow Road

Posted on July 3, 2018 at 4:25 PM by Jake Meshke

Four (4) driveway culverts in the northern cul-de-sac of N Sleepy Hollow Road and the cul-de-sac cross-culvert have been replaced. Ditches have been regraded in the area as needed. This week:

  • Crews will be replacing the large cross culverts near 9301 and 9302 N Sleepy Hollow Road.
  • Ditch regrading and culvert replacement will work north to a high point near 9470 N Sleepy Hollow.