Where We Are and Where We Are Going

Posted on July 9, 2018 at 9:34 AM by Jake Meshke

To this point, Village crews have installed 12 driveway culverts and one (1) cross culvert and regraded stormwater ditches as needed on N Sleepy Hollow Road. This week the eleven (11) remaining driveway culverts and majority of the ditch regrading will be completed on Sleepy Hollow.

On the week of July 16, crews will finalize any ditch regrading on Sleepy Hollow, replace four (4) large cross-culverts, and begin landscape restoration.

Looking ahead, culvert replacement and ditch regrading will begin on E Standish Place during the week of July 23. Culvert replacement and ditch regrading on Standish Place will begin in the far eastern cul-de-sac and work west towards N Lake Drive. N Tennyson Drive will be the final street to have culvert pipes replaced and stormwater ditch work completed.